What our clients say

Building Envelope Efficiency for 43 schools located throughout the UAE.

“Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.”

GEMS Schools

Energy metering & monitoring for industrial processing factory, Dubai, UAE

Anwaar Farooq – Plant Manager

“Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est laborum.”

Unilever

Power Quality Optimisation for group hotel portfolio Dubai UAE.

Realized savings 7-9%

4.5m AED project

Christo Robertze – Group Engineer

“After an excruciatingly painful time delay of almost 2 years from the date of signing the LPO, before the goods were even delivered to site, these so called power optimizers proved very cumbersome to install and took up a lot of man hours and our valuable time in re-engineering. They have been installed over a year now and we see no discernable or justified savings…oh and one unit has not even been working the entire time!”

Jumeirah Group

Energy Audit & Power Quality Optimisation for industrial food production facility, Dubai UAE.

Realized savings 15%

2.5m AED project

Barry Woods – Continual Improvement Manager

“The promise of significant financial operating savings for the facility was met with enthusiasm and relief by our struggling food sector of the business. However immediately after the installation we cross checked our DEWA bills with actual production output and saw 0 savings. Unfortunately the factory has since closed and left several people unemployed”

Al Ghurair

Ceo of Minda Inc.

Quick Contact